Draft Declaration of Performance & CE marking label - EN 1090 Structural Steelwork

Upon successful completion of the requirements of EN 1090, the final task in the CE marking process is to write your Declaration of Performance (DoP) and complete the CE Marking label.

The Construction Products Regulation requires that the CE Marking should be affixed to all construction products that the manufacturer has drawn up a DoP for. A copy of the DoP for each product needs to be supplied either as a paper copy or by electronic means with the product or permanently made available on a website.

We have created this downloadable template DoP and CE Marking label based on the common requirements of EN1090 for structural steelwork. It is a Microsoft Excel file which requires you to input certain data, which is then transferred into the standard CE Marking label and DoP format, ready for you to print or upload to your website.

 

Please notes:

  • Once you purchase this product, you will receive two emails, the second one containing a link to download the product. The download link will only remain active for 3 days so please make sure you download and save to your computer before this time.
  • The download is a compressed ZIP format and you will need to 'unzip' the file to see the Excel and PDF documents contained.
  • VAT will be added at the checkout.
  • All rights reserved. No part of this document is to be re-sold, reproduced or transmitted in any form or by any means, electronic or mechanical, without prior written consent from Conformance Limited. 

Conformance Offices

world map

UK

Great Hucklow
Buxton
Derby
SK17 8RG
England

Tel: +44 (0)1298 873800
Fax: +44 (0)1298 873801
E-mail: cemark[at]conformance.co.uk

fnd us map

 

China

Room 601, Building 13, Jinwai SOHO
Chaoyang District
Beijing
1000022
P.R. China

Tel: +86 (0)10 5702 3959


find us beijing

 
 
© 1996 - 2017 Conformance Ltd
Go To Top